Kanban Metrics: Lead Time, Cycle Time, Throughput and WIP

Four numbers tell you how work flows across a kanban board: work in progress, throughput, cycle time and lead time, plus how long open cards have been waiting. What each one means, how they relate and how to start measuring them.

By , founder of Glidely7 min readLast updated

In short

Reading time:
About 7 minutes
Best for:
Teams who run a kanban board and want to finish work faster
Try it:
Glidely’s free kanban board with card limits

The short answer

The core kanban metrics are:

  • Work in progress (WIP): how many cards are started but not finished.
  • Throughput: how many cards are finished in a period, such as a week.
  • Cycle time: how long a card takes from the moment work starts to done.
  • Lead time: how long a card takes from the moment it is requested to done.
  • Work item age: how long each unfinished card has been in progress so far.

Lead time vs cycle time

Lead time is what the customer feels: from the request to delivery. Cycle time is what the team controls: from starting work to finishing it. The gap between them is waiting time in the backlog.

Example: a card is created on Monday, someone starts it on Wednesday and it is done the following Tuesday. Its lead time is 8 days and its cycle time is 6 days.

Throughput

Throughput is a count: cards finished per week or per month. It does not care how big each card is, so it works best when cards are of similar size. A steady throughput lets you forecast: if the team finishes about 12 cards a week, 36 cards in the backlog are roughly three weeks of work.

WIP and Little’s Law

The metrics are linked. Little’s Law, from queueing theory, says that on average:

cycle time = work in progress ÷ throughput

If a team has 12 cards in progress and finishes 6 a week, each card takes about two weeks. Halve the work in progress and, if throughput holds, cards finish in half the time. That is why kanban teams set WIP limits: fewer things at once means each thing finishes sooner.

Work item age and the aging chart

Cycle time is only known once a card is done. Work item age looks at cards still open: how many days each has been in progress. An aging chart plots every open card by its column and its age, so a card that has been in Review far longer than usual stands out while there is still time to help it along.

Cumulative flow diagram

A cumulative flow diagram stacks the number of cards in each column over time. Bands of steady width mean work flows smoothly. A band that keeps widening means cards pile up at that stage: that column is the bottleneck.

How to start measuring

  1. Make sure every card has a clear start (it enters In progress) and a clear finish (it enters Done).
  2. Count finished cards each week: that is your throughput.
  3. For a few weeks, note how many days each card took from start to done, and look at the typical range rather than the average alone.
  4. Check open cards each week and ask about any that are much older than usual.
  5. Change one thing at a time, such as a lower WIP limit, and watch the numbers.

Common mistakes

  • Comparing teams by throughput: card sizes differ, so the numbers do not compare.
  • Using metrics to judge people instead of to improve the flow.
  • Measuring without WIP limits: with no limit, cycle time just grows.
  • Cards that never finish: split work that would sit in progress for weeks.

Measuring in Glidely

Every Glidely card records when it was created and when it was finished. Analytics on Pro and Max charts the cards created and finished in a period (your throughput), open work by priority and overdue cards on each board. Card limits on lists keep work in progress in check: Glidely shows the count against the limit and flags the list when it goes over. Export a board as CSV to work out cycle and lead time in a spreadsheet. New to kanban? Start with what a kanban board is.

Frequently asked questions

What is the difference between lead time and cycle time?

Lead time runs from the moment work is requested to the moment it is done. Cycle time runs from the moment work starts to the moment it is done. Lead time includes the wait in the backlog.

What is a good cycle time?

There is no universal number. What matters is that it is predictable and getting shorter. Look at your own typical range and work on the cards that take far longer.

What is throughput in kanban?

Throughput is the number of cards a team finishes in a period, such as a week. It is used to see trends and to forecast how long a backlog will take.

What is Little’s Law in kanban?

Little’s Law says average cycle time equals average work in progress divided by average throughput. With throughput steady, less work in progress means shorter cycle times.

Try Glidely free

Boards, team chat and a calendar in one calm workspace. Free plan, no credit card.

See pricing

Ready to try it? Glidely’s Free plan includes kanban boards with card limits, with no time limit and no credit card.

If you have any questions about this page, email us at support@glidely.site.